Automated Test Lanes
|
|
|
|
Phone Office 0161
4776121
Phone John Bourke 0796804222
|
|
NEW ATL TEST
LANES
as at August 2011
Class 7 Automatic MOT
Test Lanes -
2. Class IV & VII MOT with 4 Post Lift |
nett
|
£23,990 |
4. Class IV & VII MOT with Scissor Lift |
nett
|
£28,500 |
6. Class IV & VII MOT Pit.. |
nett
|
£19,500 |
7. MOT Accessories Pack- signs, mot
tools, tapley etc
|
nett
|
£
650
|
8. Gas and Diesel
Analyser:
|
(A) Used - 4
Gas
from
|
nett |
£
995 |
(B) Used -
Diesel
from
|
nett
|
£
995
|
Note: All updates and calibration will be
Added as Extra to above nett price.
|
(C) Reconditioned - Bosch Combined Gas & Diesel
Analyser
including Updates & Calibration.
|
nett
|
£ 3,500
|
(D) New - Bosch Combined Gas & Diesel Analyser
including Updates & Calibration with standard
Bluetooth RPM and Oil Temperature.
|
nett
|
£ 5,500
|
9. All Delivery & Installation, Calibration will be confirmed at Confirmation
of Order.
|
10. All Prices Plus VAT at 20%
|
|
|
11. We accept Payment by Cheque, Direct Debit Card &
Credit Card (Charges Apply)
|
|
|
12. Low Deposit Lease Terms will be Quoted on Request
|
|
|
|
|
|
|
|
|
|
|
|
A class 7 MOT
automated test lane bay will allow you to test not only cars but larger
vans - Transits, Sprinters etc, steal a march on your competitors,
upgrade to a class 7 automated test lane and increase your profits !
Fully automatic test procedure with operator guidance & computer
based application for user-friendly operation
system allows for the easy intergration of additional facilities at a
later date.
• Each floor group has its own
control module as a programmable electronic unit.
• All control modules of the connected floor
groups and external devices and console are connected.
• Modular technology assures trouble-free
adaption and / or retro-fitting of any number of devices.
• Central data management reduces the
possibility of errors.
• Time-saving 'one-time only' input of customer
information and vehicle data.
• History of all relevant measurements and test
data as well as target / actual documentation.
• Networking of test equipment with other
workshop systems through 'asanetwork' e.g. commercial software,
time recording, spare
part procurement etc.
|
DUO + 1
Exactly horizontal runways
for wheel alignment.
Pinch point protection and
synchronization check by light barrier.
Both runways independently
adjustable (accuracy approx. 1/10 mm)
|
DUO + 1 scissor lift option
4.2 ton
with optional axle lift
Maintenance-free cylinder system.
Cables and hoses protected
by installation inside scissors tubes.
Surface mounting or infloor installation
Manual lowering function
as standard
High throughput by
shortened raising / lowering time of 20 s or 12 s (optional)
|
ZS Square underfloor lift
|
Lite 1.1 Beamtester |
|
|
|
|