|
Terms & Conditions :
1) All prices quoted are plus
vat @ 20%.
2) Quotation subject to
change without notice – generally valid for 30 days from date of your
officially received quotation.
3) Equipment delivered and
installed inclusive in the price quoted to a prepared site.
Excluding :
(a) All pit bed and civil
engineering work for ducting of cables.
(b) All permanent wiring up
of the 3 phase equipment as per your order.
(c) Air supply if required,
must be within a metre of each item of equipment
i.e. 4 post lift and to 10
bar pressure (145 psi)
(d) Load Test will be carried
out fee of charge on the day of installation, providing the Customer
has available a vehicle of the correct size and weight with a Weigh
Bridge Certificate, which will fit onto the vehicle lift being
installed - we will advise.
(e) Provide forklift / or
other measures to assist unloading of the equipment onto site and aid
installation as required.
(f) To dispose of packaging
materials in a manner conforming to Local Authority Standards.
Any questions on the above
will be dealt with on Engineers visit to survey site or telephone the
office :: Sales
0161-477-6121 ask for John Bourke
General ::
An item appearing on this website does not constitute an offer of sale,
please contact the office for availability and pricing.
Erroneous or incorrect prices (if any) shown on this website are
superceded by the prices pertaining at the office, please contact the
office for availability and pricing.
Manufacturers specifications
/ colours etc may be subject to change.
All images on this website
are copyright © of the relevant manufacturers or suppliers or of A.T.L.
unless otherwise stated
|